NEA slashes load shedding by 1 hour per day

20 May 2016
738 times

Kathmandu, 20 May : Nepal Electricity Authority (NEA) has slashed load shedding by one hour a day effective from Friday.

Earlier, load shedding hours were limited to 77 hours a week.

Now the power outage time reduced to 70 hours a week and around 10 hours a day.

After water level rise in rivers due to rainfall, NEA had reduced the load shedding hours.

Rate this item
(0 votes)

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.